Supply Date22 Dec 2022
Contract NumberSAFAL/P/MN ORE/12.03/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity30.58
Freight29.8315116223
Loading Charges1.67
Offloading Charges0.833878352
Royalty7.767
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4162.01
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.50
Fe1.15
SiO27.10
Al2O32.25
P0.09
Size 0-10MM2.10
Size 10-20MM1.60
Size 20-100MM57.50
Size +100MM38.80
MOISTURE0.50