Supply Date15 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity33.44
Freight29.8315116223
Loading Charges1.67
Offloading Charges-10.38038278
Royalty4.22
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3723.25
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.50
Fe9.10
SiO213.50
Al2O37.90
P0.120
Size 0-10MM10.50
Size 10-20MM8.90
Size 20-100MM70.50
Size +100MM10.10
MOISTURE4.80