Supply Date15 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity23.18
Freight12.53
Loading Charges4.5
Offloading Charges-8.907679034
Royalty5.23
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2071.19
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.60
Fe4.95
SiO213.10
Al2O34.61
P0.172
Size 0-10MM3.12
Size 10-20MM2.90
Size 20-100MM78.37
Size +100MM15.61
MOISTURE2.50