Raw Material Inward
| Supply Date | 17 Jan 2022 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/11.33/2021 |
| Item | Manganese Ore |
| Supplier Name | Gamcore Zambia Limited |
| Grade (%) | High (44% - 50%) |
| Lot Number | Gamcore Ltd- Mn Ore |
| Deviance | |
| Inward Quantity | 35.9 |
| Freight | 345 |
| Loading Charges | 16.518 |
| Offloading Charges | 0 |
| Royalty | 108.35 |
| Other Cost | 8.028 |
| Quality Deviance | (not set) |
| Grade Deviance | (not set) |
| Total Cost | 4950.75 |
| Conversion Rate (Please insert 1 if no conversion is required) | 16.518 |
| Inward Status | Accepted |