Supply Date14 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity27.52
Freight12.53
Loading Charges4.5
Offloading Charges-8.907703488
Royalty5.23
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2458.98
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.61
Fe3.90
SiO214.20
Al2O34.12
P0.165
Size 0-10MM5.10
Size 10-20MM3.90
Size 20-100MM75.95
Size +100MM15.85
MOISTURE2.60