Supply Date14 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity28.9
Freight12.53
Loading Charges4.5
Offloading Charges-8.907612457
Royalty5.1
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2578.53
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.10
Fe4.55
SiO213.10
Al2O34.66
P0.170
Size 0-10MM4.66
Size 10-20MM4.20
Size 20-100MM76.10
Size +100MM15.04
MOISTURE2.50