Supply Date13 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity30.24
Freight12.53
Loading Charges4.5
Offloading Charges-8.907738095
Royalty5.2
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2701.11
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.50
Fe4.50
SiO212.10
Al2O35.24
P0.170
Size 0-10MM4.90
Size 10-20MM7.15
Size 20-100MM78.94
Size +100MM9.01
MOISTURE4.05