Supply Date13 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity29.36
Freight12.53
Loading Charges4.5
Offloading Charges-8.907356948
Royalty5.12
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2620.16
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.20
Fe3.90
SiO212.61
Al2O36.15
P0.169
Size 0-10MM5.10
Size 10-20MM2.61
Size 20-100MM82.09
Size +100MM10.20
MOISTURE3.12