Supply Date09 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity28.18
Freight12.53
Loading Charges4.5
Offloading Charges-8.907381121
Royalty5.35
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2521.34
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.10
Fe5.21
SiO212.90
Al2O35.10
P0.177
Size 0-10MM3.690
Size 10-20MM2.10
Size 20-100MM79.10
Size +100MM15.20
MOISTURE4.10