Supply Date08 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity28.76
Freight12.53
Loading Charges4.5
Offloading Charges-8.907162726
Royalty5.2
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2568.92
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.50
Fe4.12
SiO211.60
Al2O34.59
P0.172
Size 0-10MM2.50
Size 10-20MM3.12
Size 20-100MM83.72
Size +100MM10.66
MOISTURE3.92