Supply Date07 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity32.04
Freight29.8315116223
Loading Charges1.67
Offloading Charges0.719725343
Royalty3.89
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3912.44
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn35.02
Fe7.90
SiO221.99
Al2O38.38
P0.130
Size 0-10MM10.90
Size 10-20MM8.81
Size 20-100MM78.19
Size +100MM2.10
MOISTURE6.10