Supply Date07 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity29.42
Freight12.53
Loading Charges4.5
Offloading Charges-8.907205982
Royalty5.12
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2625.52
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.20
Fe4.10
SiO213.01
Al2O34.50
P0.170
Size 0-10MM2.50
Size 10-20MM2.10
Size 20-100MM79.80
Size +100MM15.60
MOISTURE3.10