Supply Date05 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity26.42
Freight12.53
Loading Charges4.5
Offloading Charges-8.907645723
Royalty5.23
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2360.69
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.60
Fe4.15
SiO212.81
Al2O34.50
P0.175
Size 0-10MM1.75
Size 10-20MM2.60
Size 20-100MM-
Size +100MM10.61
MOISTURE2.61