Supply Date05 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity33.22
Freight29.8315116223
Loading Charges1.67
Offloading Charges0.634858519
Royalty5.73
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4114.84
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.50
Fe3.94
SiO214.50
Al2O37.17
P0.122
Size 0-10MM7.50
Size 10-20MM6.90
Size 20-100MM70.50
Size +100MM15.10
MOISTURE2.60