Supply Date05 Dec 2022
Contract NumberSAFAL/P/MN ORE/10.11/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity40.98
Freight28.04
Loading Charges0
Offloading Charges0
Royalty6.94
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4957.76
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.80
Fe4.12
SiO212.50
Al2O33.06
P0.15
Size 0-10MM3.50
Size 10-20MM2.10
Size 20-100MM28.08
Size +100MM66.32
MOISTURE3.21