Supply Date03 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity27.48
Freight12.53
Loading Charges4.5
Offloading Charges-8.907569141
Royalty5.11
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2452.11
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.15
Fe4.61
SiO213.50
Al2O35.01
P0.170
Size 0-10MM1.50
Size 10-20MM3.60
Size 20-100MM79.24
Size +100MM15.66
MOISTURE3.90