Supply Date03 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity23.02
Freight12.53
Loading Charges4.5
Offloading Charges-8.907471764
Royalty5.35
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2059.66
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.10
Fe3.91
SiO212.61
Al2O34.81
P0.163
Size 0-10MM3.10
Size 10-20MM2.14
Size 20-100MM83.86
Size +100MM10.90
MOISTURE3.51