Supply Date02 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity17.36
Freight0
Loading Charges4.5
Offloading Charges-2.790322581
Royalty5.08
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1437.23
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.05
Fe4.10
SiO213.61
Al2O35.01
P0.171
Size 0-10MM2.10
Size 10-20MM3.50
Size 20-100MM83.80
Size +100MM10.30
MOISTURE3.60