Supply Date02 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity31.82
Freight29.8315116223
Loading Charges1.67
Offloading Charges0.736015085
Royalty6.18
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3958.97
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn44.15
Fe4.20
SiO213.50
Al2O36.10
P0.120
Size 0-10MM6.50
Size 10-20MM7.10
Size 20-100MM82.45
Size +100MM3.95
MOISTURE2.81