Raw Material Inward
| Supply Date | 01 Dec 2022 |
|---|---|
| Contract Number | SAFAL/P/STEAM COAL/12.09/2022 |
| Item | Steam Coal |
| Supplier Name | Maamba Energy Limited |
| Grade (%) | N/A |
| Lot Number | Coal Maamba Collieries-Lot No-2(Peas) |
| Deviance | 0 |
| Inward Quantity | 29.44 |
| Freight | 1040.86 |
| Loading Charges | -69.0529019 |
| Offloading Charges | 0 |
| Royalty | 0 |
| Other Cost | 0 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 4287.12 |
| Conversion Rate (Please insert 1 if no conversion is required) | 16.7608 |
| Inward Status | Accepted |