Supply Date01 Dec 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity17.84
Freight0
Loading Charges4.5
Offloading Charges-2.954596413
Royalty5.12
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1474.75
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.20
Fe4.15
SiO212.50
Al2O34.24
P0.172
Size 0-10MM2.10
Size 10-20MM3.24
Size 20-100MM79.0
Size +100MM15.69
MOISTURE3.81