Supply Date29 Nov 2022
Contract NumberSAFAL/P/MN ORE/11.04/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity18.64
Freight0
Loading Charges-7.018240343
Offloading Charges3.1183
Royalty5.38
Other Cost1
Quality Deviance(not set)
Grade Deviance0
Total Cost1444.23
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.15
Fe4.01
SiO212.98
Al2O35.10
P0.169
Size 0-10MM4.2
Size 10-20MM2.10
Size 20-100MM76.75
Size +100MM16.95
MOISTURE3.10