Supply Date29 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity19
Freight0
Loading Charges-7.008421053
Offloading Charges3.1119
Royalty5.38
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1472.19
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.20
Fe4.10
SiO213.20
Al2O34.95
P0.171
Size 0-10MM3.10
Size 10-20MM2.90
Size 20-100MM78.40
Size +100MM15.60
MOISTURE2.85