Supply Date28 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity22.86
Freight0
Loading Charges-7.018372703
Offloading Charges2.78
Royalty5.11
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1757.29
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.10
Fe6.10
SiO213.20
Al2O34.15
P0.170
Size 0-10MM2.90
Size 10-20MM5.10
Size 20-100MM71.90
Size +100MM20.10
MOISTURE3.80