Supply Date24 Nov 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity30.14
Freight31.53
Loading Charges2.03
Offloading Charges0.797961513
Royalty6.87
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3834.65
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.52
Fe3.80
SiO210.98
Al2O33.85
P0.14
Size 0-10MM4.50
Size 10-20MM1.60
Size 20-100MM78.10
Size +100MM15.80
MOISTURE2.10