Supply Date24 Nov 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity36.36
Freight31.53
Loading Charges2.34
Offloading Charges-2.336358636
Royalty6.2
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4498.96
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn44.20
Fe4.22
SiO211.50
Al2O34.12
P0.14
Size 0-10MM3.56
Size 10-20MM5.60
Size 20-100MM70.40
Size +100MM20.10
MOISTURE2.10