Supply Date24 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity27.3
Freight13.24
Loading Charges-7.013919414
Offloading Charges3.011
Royalty5.13
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2467.02
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.20
Fe4.01
SiO212.80
Al2O34.51
P0.179
Size 0-10MM1.81
Size 10-20MM3.50
Size 20-100MM78.88
Size +100MM15.81
MOISTURE2.20