Supply Date23 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity28.04
Freight13.24
Loading Charges-7.014265335
Offloading Charges2.78
Royalty5.13
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2527.41
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.20
Fe4.50
SiO212.80
Al2O34.90
P0.172
Size 0-10MM3.10
Size 10-20MM1.90
Size 20-100MM87.32
Size +100MM7.68
MOISTURE3.50