Supply Date21 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity29.34
Freight13.24
Loading Charges-7.013974097
Offloading Charges2.99495
Royalty5.23
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2653.83
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.60
Fe4.15
SiO211.95
Al2O34.50
P0.180
Size 0-10MM3.50
Size 10-20MM6.10
Size 20-100MM75.30
Size +100MM15.10
MOISTURE3.45