Supply Date17 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity19.56
Freight0
Loading Charges-7.017893661
Offloading Charges3.1024
Royalty5.21
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1511.88
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.50
Fe4.66
SiO212.90
Al2O33.90
P0.169
Size 0-10MM4.15
Size 10-20MM6.20
Size 20-100MM73.75
Size +100MM15.90
MOISTURE3.81