Supply Date17 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity28.9
Freight13.24
Loading Charges-7.01384083
Offloading Charges2.9982
Royalty5.13
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2611.24
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.20
Fe5.10
SiO213.61
Al2O34.10
P0.170
Size 0-10MM3.80
Size 10-20MM3.50
Size 20-100MM74.10
Size +100MM18.60
MOISTURE4.2