Supply Date16 Nov 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity41.98
Freight31.53
Loading Charges2.028
Offloading Charges0
Royalty6.87
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5307.45
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.50
Fe4.50
SiO210.81
Al2O34.05
P0.13
Size 0-10MM3.50
Size 10-20MM3.60
Size 20-100MM67.80
Size +100MM25.10
MOISTURE1.13