Supply Date16 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity31.36
Freight13.24
Loading Charges-7.014030612
Offloading Charges2.9811
Royalty5.21
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2835.48
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.50
Fe4.81
SiO211.95
Al2O34.10
P0.169
Size 0-10MM3.50
Size 10-20MM7.10
Size 20-100MM78.80
Size +100MM10.60
MOISTURE4.90