Supply Date14 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity27.6
Freight13.24
Loading Charges-7
Offloading Charges3.0085
Royalty5.34
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2500.24
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.01
Fe4.62
SiO211.95
Al2O34.10
P0.160
Size 0-10MM3.60
Size 10-20MM4.10
Size 20-100MM76.10
Size +100MM16.20
MOISTURE3.81