Supply Date14 Nov 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity37.92
Freight31.534
Loading Charges2.245
Offloading Charges0
Royalty3.91
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4690.29
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn35.10
Fe6.80
SiO220.80
Al2O33.50
P0.12
Size 0-10MM6.10
Size 10-20MM5.60
Size 20-100MM72.70
Size +100MM15.60
MOISTURE2.20