Supply Date12 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity30.16
Freight13.24
Loading Charges-6.993700265
Offloading Charges2.989
Royalty5.34
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2731.75
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.01
Fe3.92
SiO211.85
Al2O33.95
P0.162
Size 0-10MM3.10
Size 10-20MM4.60
Size 20-100MM76.50
Size +100MM15.80
MOISTURE3.50