Supply Date11 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity20.88
Freight0
Loading Charges-6.816091954
Offloading Charges2.88
Royalty5.11
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1611.39
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.10
Fe3.81
SiO213.10
Al2O35.60
P0.16
Size 0-10MM3.10
Size 10-20MM2.50
Size 20-100MM78.80
Size +100MM15.60
MOISTURE2.99