Supply Date11 Nov 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity37.96
Freight31.5334
Loading Charges2.243
Offloading Charges0
Royalty7.04
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4813.95
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.10
Fe4.09
SiO29.82
Al2O34.75
P0.12
Size 0-10MM2.15
Size 10-20MM3.60
Size 20-100MM19.70
Size +100MM13.95
MOISTURE2.10