Supply Date09 Nov 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity40.22
Freight31.5338
Loading Charges2.117
Offloading Charges0
Royalty6.95
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5091.88
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.8
Fe5.62
SiO210.01
Al2O34.24
P0.112
Size 0-10MM3.2
Size 10-20MM4.1
Size 20-100MM72.1
Size +100MM20.6
MOISTURE2.1