Supply Date07 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity31.92
Freight13.24
Loading Charges-6.81641604
Offloading Charges2.78
Royalty5.57
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2897.49
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.90
Fe3.70
SiO210.88
Al2O33.95
P0.170
Size 0-10MM3.81
Size 10-20MM2.01
Size 20-100MM78.58
Size +100MM15.60
MOISTURE2.90