Supply Date05 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity29.56
Freight13.24
Loading Charges2.77
Offloading Charges-7
Royalty5.47
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2674.59
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.5
Fe4.5
SiO2
Al2O34.92
P0.17
Size 0-10MM2.1
Size 10-20MM3.1
Size 20-100MM84.2
Size +100MM10.6
MOISTURE2.9