Supply Date07 Nov 2022
Contract NumberSAFAL/P/MN ORE/11.02/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai Mathews- MN ore MG
Deviance0
Inward Quantity39.12
Freight31.533
Loading Charges2.11641286919
Offloading Charges0
Royalty7.3
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4966.26
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.95
Fe5.81
SiO211.1
Al2O33.02
P0.13
Size 0-10MM2.81
Size 10-20MM3.5
Size 20-100MM83.08
Size +100MM10.6
MOISTURE2.9