Supply Date05 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity20.68
Freight0
Loading Charges-7
Offloading Charges2.78
Royalty5.47
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1597.53
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.50
Fe4.50
SiO211.90
Al2O34.92
P0.17
Size 0-10MM2.10
Size 10-20MM3.10
Size 20-100MM0
Size +100MM10.60
MOISTURE2.90