Supply Date05 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity22.34
Freight13.24
Loading Charges0
Offloading Charges-17.54789615
Royalty5.56
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1725.81
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.60
Fe3.90
SiO212.50
Al2O34.50
P0.16
Size 0-10MM3.50
Size 10-20MM2.90
Size 20-100MM0
Size +100MM10.80
MOISTURE2.50