Supply Date05 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity31.28
Freight13.24
Loading Charges2.73
Offloading Charges-6.874040921
Royalty5.56
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2835.72
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.20
Fe4.10
SiO211.81
Al2O33.61
P0.16
Size 0-10MM2.81
Size 10-20MM1.60
Size 20-100MM0
Size +100MM510
MOISTURE4.10