Supply Date04 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity36.06
Freight13.24
Loading Charges2.76
Offloading Charges-7
Royalty5.11
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3249.37
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.12
Fe4.10
SiO212.50
Al2O34.10
P0.160
Size 0-10MM2.2
Size 10-20MM2.90
Size 20-100MM92.80
Size +100MM2.10
MOISTURE2.6