Supply Date04 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity22.92
Freight0
Loading Charges2.76
Offloading Charges-7
Royalty5.57
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1772.4
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.90
Fe3.18
SiO212.90
Al2O33.18
P0.171
Size 0-10MM3.50
Size 10-20MM2.60
Size 20-100MM93.90
Size +100MM0
MOISTURE4.90