Supply Date04 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity23.78
Freight0
Loading Charges2.76
Offloading Charges-6.89823381
Royalty5.39
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1837.05
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.60
Fe2.90
SiO213.10
Al2O33.9
P0.17
Size 0-10MM3.10
Size 10-20MM5.10
Size 20-100MM88.0
Size +100MM3.8
MOISTURE3.18