Supply Date03 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity23.28
Freight0
Loading Charges2.76
Offloading Charges-6.997852234
Royalty5.39
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1796.1
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.20
Fe5.10
SiO212.89
Al2O33.37
P0.168
Size 0-10MM2.55
Size 10-20MM3.60
Size 20-100MM88.50
Size +100MM5.35
MOISTURE2.50