Supply Date01 Nov 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity17.38
Freight0
Loading Charges-6.998273878
Offloading Charges2.76
Royalty5.76
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1347.33
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.6
Fe4.1
SiO211.01
Al2O33.95
P0.162
Size 0-10MM3.1
Size 10-20MM2.6
Size 20-100MM83.8
Size +100MM10.5
MOISTURE2.95